Skip to main content

Replicate data from KingbaseES for Oracle to Kafka

Supported capabilities​

CapabilitySupport
Schema replicationSupported
Full replicationSupported
Incremental replicationSupported
Structural comparisonNot supported
Data comparisonNot supported
Incremental comparisonNot supported

Procedure​

  1. Sign in to the NineData Console.

  2. In the left navigation pane, click Replication > Data Replication.

  3. On the Replication page, click Create Replication.

  4. On the Source & Target tab, configure the fields in the table, and click Next.

    Parameter
    Description
    NameEnter a name for the data synchronization task. To make the task easier to find and manage later, use a meaningful name. Up to 64 characters are supported.
    SourceThe data source that contains the objects to synchronize.
    TargetThe data source that receives the synchronized objects.
    Target Object NameSelect the case conversion rule for object names after they are migrated from the source to the target.
    • Convert all to Lowercase: Regardless of the naming rule on the source, all target names are lowercase.
    • Consistent with Source: Keep the naming rule of the source.
    • Convert all to Uppercase: Regardless of the naming rule on the source, all target names are uppercase.
    TypeSelect the replication type.
    • Schema: Synchronize only the database and table schemas of the source data source, without synchronizing data.
    • Full: Synchronize all objects and data from the source data source, namely full data replication.
    • Incremental: After full synchronization completes, perform incremental synchronization based on the logs of the source data source.
    Incremental StartedRequired only when Type is Incremental.
    • From Started: Use the current replication task start time as the baseline for incremental replication.
    • Customized Time: Select the point in time from which incremental replication starts. Select a time zone based on the region of your business. If the configured time point is earlier than the current replication task start time and DDL operations occurred during that period, the replication task will fail.
    SpecThe specification of the replication task. A larger specification provides a higher replication rate. Hover over the details icon to view the rate and configuration information of each specification. If you configure the data replication task before purchasing resources, you can select the required specification here. If you purchase resources before configuring the task, NineData selects the specification specified during purchase, and you cannot change it in the task configuration.
    If target table already exists (Required when Schema is selected)
    • Pre-Check Error and Stop Task: Stop the task when a table with the same name is detected during the precheck stage.
    • Skip and Continue Task: When a table with the same name is detected during the precheck stage, display a message and continue the task. During schema replication, ignore the table with the same name. If you also perform data replication, data is appended to the table with the same name and existing data is not overwritten.
    • Delete Objects and Rewrite: When a table with the same name is detected during the precheck stage, display a message and continue the task. During schema replication, delete the table with the same name in the target database and replicate the table schema again based on the source database. If you also perform data replication, data is written after schema replication completes.
    Target Table Exists Data (Required when Full is selected)
    • Pre-Check Error and Stop Task: Stop the task when data is detected in the target table during the precheck stage.
    • Ignore existing target data and append to it.: When data is detected in the target table during the precheck stage, ignore that data and append other data.
    • Clear target existing data before write: When data is detected in the target table during the precheck stage, delete that data and write it again.
    Incremental data conflict handling strategy for target table (Required when Incremental is selected)
    • Runtime error: During incremental replication, report an error when target data already exists and wait for manual intervention.
    • Do not update target data: During incremental replication, do not write data when target data already exists, and continue subsequent tasks.
    • Update target data: During incremental replication, overwrite the target data when target data already exists.
  5. On the Objects tab, configure the parameters in the table, and click Next.

    Parameter
    Description
    Replication ObjectsSelect the content to replicate. Select All Objects to replicate all content in the source database, or select Customized Object, select the content to replicate in the Source Object list, and click > to add it to the Target Object list on the right.

    To create multiple replication tasks with the same replication objects, import a configuration file. Click Import Config, click Download Template to download the template, edit the file, and then click Upload to upload it and import the objects in bulk. For field descriptions and examples, see Import Replication Object Templates. The configuration file uses these fields:

  6. On the Pre-check tab, wait for the precheck to finish. After it passes, open the saved task's details from the replication task list and start the task.

    • Select Enable data consistency comparison. Based on the selected Type, the system automatically starts a data consistency comparison based on the source data source at the corresponding time. The comparison checks whether the source and target data are consistent. The start time is as follows:

      • Schema: Starts after schema replication completes.
      • Schema+Full: Starts after full replication completes.
      • Full: Starts after full replication completes.
      • Schema+Full+Incremental, Incremental: Starts when incremental data is consistent with the source data source for the first time and Delay is 0 seconds. Click View Details to view synchronization delay on the Details page. sync_delay
    • If the precheck fails, click Details in the Actions column for the failed check item, review the cause, fix the issue, and then click Check Again to run the precheck again until it passes.

    • Items with Warning in Result can be fixed or ignored if required.

  7. After the replication task starts, you can perform the following actions:

    • Click View Details to view the execution status of each stage of the synchronization task.
    • Click Back to list to return to the Replication task list page.

Modify incremental synchronization positions​

For a task whose replication type includes Incremental and whose task details provide position management, you can view and modify synchronization positions. The available position types and input format depend on the data source and replication link. Follow the options displayed for the current task. If a position is shown as - or no position type is available for selection, the current task has no position available for modification.

This feature is intended for specific operations and maintenance scenarios where you need to specify a new log-read position or synchronization-write position for an incremental task. The read position controls where the task continues reading from the source, while the write position controls where it continues processing synchronized writes. After you submit the change, the task pauses and restarts so that the new position can take effect.

  1. In the replication task list, click the Task ID of the target task to open its details.

  2. On the Incremental tab, click Synchronous site management to view the current read site and write site.

  3. Click modify site. Under site type, select the read site or write site to adjust, and then enter the value for Adjustment point according to the position type displayed for the task.

  4. Confirm the value and scope of impact, and click Verify and submit. The task enters a pause and relaunch process. After the task resumes running, open Synchronous site management again to confirm that the position has been updated.

danger

Modifying the synchronization point will adjust the point of log reading or synchronization writing, which may cause data loss, so operate with caution! Modifying either position may cause data loss or inconsistency between the source and target. Perform this operation only in an authorized test environment or during a maintenance window with a backup and rollback plan. A task whose incremental replication has finished cannot have its position reset.